Niagara Renovations - Finish Job

One of our clients was in a bind. Some work had been done, but it wasn’t able to be finished. We were called to come in and take over finishing the project.

We finished installing bolection moulding on the wainscotting with a backer piece. We weren’t able to find the same material that was previously used and ours was thinner. Our solution did the trick.

We also added a base board, shoe moulding and a chair rail/nosing for the top of the wainscotting.